Close Menu
  • Latest News
    • Market
    • Altcoins
    • Legal and Regulatory
  • Tech
    • Blockchain
    • Security and Privacy
  • Web 3
    • Web3 News
    • NFTs
    • Gaming
  • Learn
    • Education
    • Investments
    • Staking
    • Wallets and Exchanges
  • ICOs
  • Mining
  • Crypto Tools
    • Exchange Tool
  • Shop
What's Hot

Public crypto miners sold more BTC in Q1 2026 than all of 2025: Report

April 16, 2026

SEC Approves Elimination of Pattern Day Trader Rule and $25,000 Minimum: FINRA

April 16, 2026

Firstsource Launches Kairos — The Operating System Powering Intelligence That Operates

April 16, 2026
Facebook X (Twitter) Instagram
  • Contact
  • Privacy Policy
  • Terms & Conditions
Facebook X (Twitter) Instagram
CryptoPulseDaily.com
  • Latest News
    • Market
    • Altcoins
    • Legal and Regulatory
  • Tech
    • Blockchain
    • Security and Privacy
  • Web 3
    • Web3 News
    • NFTs
    • Gaming
  • Learn
    • Education
    • Investments
    • Staking
    • Wallets and Exchanges
  • ICOs
  • Mining
  • Crypto Tools
    • Exchange Tool
  • Shop
CryptoPulseDaily.com
Home»Mining»Bitdeer’s New Bitcoin Mining Facility in Ohio Caught on Fire
Mining

Bitdeer’s New Bitcoin Mining Facility in Ohio Caught on Fire

November 13, 2025No Comments2 Mins Read
Share
Facebook Twitter LinkedIn Pinterest Email

A fire in Massillon, Ohio affected two buildings belonging to publicly traded Bitcoin miner Bitdeer, the firm announced. 

The Tuesday fire was extinguished shortly after the local fire department was dispatched, and no injuries were reported. 

“Earlier yesterday afternoon at around 2pm, on Tuesday, Nov 11, Bitdeer’s Massillon site sustained a fire that affected 2 buildings within the facility,” the firm posted on X. “The facility is under construction and site management is investigating to determine the cause of the fire and extent of the damage.”

Earlier yesterday afternoon at around 2pm, on Tuesday, Nov 11, Bitdeer’s Massillon site sustained a fire that affected 2 buildings within the facility. The local fire department was dispatched and extinguished the fire shortly after arrival with no injuries resulting from the…

— Bitdeer (@BitdeerOfficial) November 12, 2025

Bitdeer’s Massillon site has been under construction with its first electrical power connection expected to happen this month, according to a recent investor update. The fire only affected two of the 26 total buildings on site, and no mining equipment had been installed there, according to the firm. Bitdeer does not anticipate the fire will have any impact on its current operational hashrate.

In an interview with local news outlet the Canton Repository, fire chief Matt Heck said the blaze “didn’t appear to be anything intentional,” though an investigation into the cause and full extent of the damage is ongoing. 

Singapore-based Bitdeer has multiple sites in Ohio and maintains mining operations in Texas, Norway, and other locations globally. 

See also  Bitcoin Miner Activity Signals Price Movements

The firm reported a net loss of $266.7 million in its Q3 earnings call earlier this week, sending shares of Nasdaq-listed BTDR down close to 20% and closing Monday around $17.64. 

Shares have fallen even further since, falling 6% on Wednesday and now down more than 31% in the last five trading days, changing hands at $14.10.

Like other crypto mining firms, Bitdeer has been expanding its scope beyond mining, seeking to capture opportunity provided by the demand for computing power due to the rise of generative artificial intelligence (AI). 

Source link

Bitcoin Bitdeers Caught facility Fire mining Ohio
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Public crypto miners sold more BTC in Q1 2026 than all of 2025: Report

April 16, 2026

Lava Network Brings Bitcoin Cash Online with Reliable RPC Infrastructure

April 16, 2026

Here’s The Next Key Bitcoin Price Resistance To Worry About

April 16, 2026

Bitcoin (BTC) can be used as cash, but capital gains taxes turn even a cup of coffee into a mountain of paperwork

April 16, 2026
Add A Comment
Leave A Reply Cancel Reply

Top Posts

NYSE CPO says blockchain should complement, not replace, traditional markets

March 29, 2026

Nasdaq files to list 21Shares Dogecoin ETF, signaling mainstream crypto acceptance

April 29, 2025

Meme Coin Liquidity Hits Record High $128M Even as Bid-Ask Spread Spotlights Risk

June 23, 2024

Subscribe to Updates

Get the latest creative news From Crypto Daily Pulse directly in your Inbox!

Our mission is to develop a community of people who try to make financially sound decisions. The website strives to educate individuals in making wise choices about Crypto, ICOs, Web3, Blockchain and more.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights

Public crypto miners sold more BTC in Q1 2026 than all of 2025: Report

April 16, 2026

SEC Approves Elimination of Pattern Day Trader Rule and $25,000 Minimum: FINRA

April 16, 2026

Firstsource Launches Kairos — The Operating System Powering Intelligence That Operates

April 16, 2026
Get Informed

Subscribe to Updates

Get the latest creative news From Crypto Daily Pulse directly in your Inbox!

  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Crypto Pulse Daily - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.

Cleantalk Pixel
  • bitcoinBitcoin(BTC)$75,094.000.42%
  • ethereumEthereum(ETH)$2,346.21-0.57%
  • tetherTether(USDT)$1.00-0.01%
  • rippleXRP(XRP)$1.454.13%
  • binancecoinBNB(BNB)$634.591.85%
  • usd-coinUSDC(USDC)$1.000.00%
  • solanaSolana(SOL)$89.365.39%
  • tronTRON(TRX)$0.326747-0.39%
  • Figure HelocFigure Heloc(FIGR_HELOC)$1.030.54%
  • dogecoinDogecoin(DOGE)$0.0982333.10%